La Terraza Road & General Progress
Greetings from
Here at Los Congos we have been making considerable progress and received finished designs on the drinking water and wastewater treatment systems. We have also received finished road designs for several locations within Los Congos. In addition, we have a road construction crew working 6 days a week within the La Terraza community.
The La Terraza road is close to 75% completed. Constructed using the natural stone found on the property the road blends into the natural surroundings. Using thousands of interlocking stones, the road provides easy access to the entire La Terraza community at Los Congos. Full rainwater runoff and stone walls follow the entire length of the road. The road construction has taken place without the use of heavy machinery to insure that the surrounding terrain remains undisturbed. We are also excited that we have been able to employ over 80 people daily during the construction.
As soon as the road is completed, I will post a summary with photos.News coming soon about The Los Congos Resort & Spa






0 Comments:
Post a Comment
<< Home